|
Facility Condition Assessment (FCA): |
Planned implementation (FCA): |
- Communication systems improvements
|
- New IP based phone/intercom system throughout.
|
|
|
- Replacement of Gym HVAC system. Installation of geothermal wells and heat pump for heating and cooling of new and limited remodeled spaces.
|
- Irrigation system upgrades
|
- Automatic irrigation system provided for all landscaped and non-native sod and seed areas.
|
- Interior finishes upgraded (i.e. ceiling tiles, carpet, wall finishes, etc.)
|
- Complete remodel of Administration and faculty office/work areas. New carpet in existing classrooms. New accessible corridor ceilings.
|
- Upgrade electrical service and distribution
|
- Improved electrical infrastructure in new and existing spaces.
|
|
|
|
Program Compatibility Assessment (PCA): |
Planned implementation (PCA): |
- Provide general upgrade of classrooms and instructional spaces
|
- Carpeting and floor finishes in new and most existing spaces.
|
- Provide science labs and classrooms
|
- (2) new science labs and (1) art studio space.
|
|
|
- New Library and support spaces including computer lab to be added.
|
|
|
- Administration health clinic and faculty areas expanded and remodeled.
|
|
|
|
Multi-Use Outdoor Facilities (MUOF): |
Planned implementation (MUOF): |
|
|
- Irrigation, sod and site improvements adjacent to building.
|
|
|
|
Information Technology (IT): |
Planned implementation (IT): |
- Upgrade WAN to provide capacity to support applications with high bandwidth demands
|
- Extend WAN to building, upgrade head end equipment.
|
- Upgrade LANs to provide reliable and responsive access to data, research, and information
|
- Upgrade existing LAN distribution.
|
- Implement VoIP to enhance communications capabilities and reduce cost
|
- Install new VoIP telecommunications system.
|