Monarch High School 
View of the front of Monarch High School 
 
Monarch High School
329 Campus Drive
Louisville, CO, 80027

303-665-5888
http://schools.bvsd.org/monarchhigh
Original construction date: 1998
Report Updated:  6/11/2008 
Project Details

NOTE: MUOF/athletic improvements are being implemented in phase I. The rest of the project will be implemented in phase III.

Principal: Barbara Spelman

Project Manager (building): To be determined

Architect (building): To be determined

Architect (MUOF/athletic): Davis Partnerships

Project Manager (MUOF/athletic): Joe Gierlach

Contractor: Golden Triangle Construction

Project Budget (total): $2,391,162

Project Budget (MUOF/athletics):

 $340,140

Supplemental Funding:

$170,000

Revised Budget:

$510,140

View expenditures to date

Design Advisory Team (DAT):

Staff
Barbara Spelman, Principal
Mark Sibley, Asst. Principal
Phil Bravo

Parents/Community

Design Advisory Team (MUOF/athletics):

Staff
Michele DeBerry
Barbara Spelman
Mark Sibley
Phil Bravo

Contact the DAT: DAT.Monarch@BVSD.org

Project Timeline
MOUF/Athletics construction scheduled 04/08 - 08/09
Project Status

Activity that has occurred this period (building):

No information at this time. This project is scheduled to go in Phase III of the bond.

Activity that has occurred this period (MUOF/Athletics):

Contractor mobilized to the site

Activity planned for next period (building):

No information at this time. This project is scheduled to go in Phase III of the bond.

Activity planned for next period (MUOF/athletics):

Construction will be completed by the start of school.

Critical issues (building):

No information at this time. This project is scheduled to go in Phase III of the bond.

Critical issues (MUOF/athletics):

None to report.

 Budget status (building):

No information at this time. This project is scheduled to go in Phase III of the bond.

 Budget status (MOUF/Athletics):

Within supplemented budget.

Schedule status (MOUF/Athletics):

On schedule. The scheduled start of construction is June 2, 2008. The scheduled completion date is August 8, 2008.

 ‭(Hidden)‬ Project Schedule (building)

 
Chart of progress on Monarch High School project

Scope of Work
 Facility Condition Assessment (FCA): Planned implementation (FCA): 
  •  Install additional exit signs
  •  Provide proper exit signage throughout the building.
  •  Irrigation system upgrades
  •  Final extent of improvements not yet determined.
  •  Repair cracking of exterior wall
  •  Final extent of improvements not yet determined.
   
Program Compatibility Assessment (PCA): Planned implementation (PCA):
  • Provide additional classroom space
  • Provide six additional language art classrooms.
  • Enlarge cafeteria
  • Plans for cafeteria not yet determined.
Multi-Use Outdoor Facilities (MUOF): Planned implementation (MUOF):
  • Provide restroom facilities at the sports complex
  • Design Drawings complete, Construction drawings complete
  • Extend utility services to the sports complex 
  • A newer sewer line is to be installed from the new restroom facilities to the existing sewer line.
  • Utilities are to be extended from the existing school to the restrooms.
  • Resurface the running track
  • The running track is to be resurfaced.
  • Possible alternate available to add a ticket booth to the restroom building.

 

  • Possible alternate available to add a storage room to the restroom building.

 

  • Project is to be bid in January of 2008.

Information Technology (IT):

Planned implementation (IT):

  • Upgrade WAN to provide capacity to support applications with high bandwidth demands
  • Extend WAN to building, upgrade head end equipment.
  • Upgrade LANs to provide reliable and responsive access to data, research, and information
  • Upgrade existing LAN distribution.
  • Implement VoIP to enhance communications capabilities and reduce cost
  • Install new VoIP telecommunications system.