| Facility Condition Assessment (FCA): |
Planned implementation (FCA): |
- HVAC upgrades including building wide air-conditioning
|
- Provide air conditioning for areas of building currently not air conditioned excluding gymnasiums and locker rooms and similar spaces.
|
- Electrical distribution improvements
|
- Electrical improvements as required for classrooms and for power to A/C equipment.
|
- Clock and intercom systems improvements
|
- Replace clock and intercom systems.
|
- Interior finishes upgraded (i.e. ceiling tiles, carpet and wall finishes, etc.)
|
- Will upgrade finishes in limited areas, priority to be determined by DAT.
|
- Roof replacement and repairs
|
- Deleted from scope as that area of building will be demolished.
|
- Restroom renovations including ADA accessibility where required
|
- Will upgrade finishes and renovate for ADA accessibility in limited areas priority to be determined by DAT.
|
- Site irrigation system improvements
|
- Field irrigation repairs and replacement of controls.
|
|
|
- Consistent interior signage throughout.
|
- Site paving replacement and repair
|
- Repave north staff parking lot.
|
| |
|
| Program Compatibility Assessment (PCA): |
Planned implementation (PCA): |
- Provide an applied technology lab facility
|
- Remodel existing shop into technology lab.
|
- Provide an additional science lab
|
- Remodel math classrooms into science lab.
|
- Renovate consumer studies
|
- Construct new consumer studies area
|
- Counseling offices addition
|
- Construct new counseling area.
|
|
|
- Remodel existing counseling area to new photo lab and classroom.
|
- Replace the original junior high wing with a two story structure
|
- Demolish existing northwest classroom wing and construct new two story addition.
|
- Provide additional Special Education classrooms and offices
|
- Construct new special education classrooms and teacher work space.
|
|
|
|
Multi-Use Outdoor Facilities (MUOF): |
Planned implementation (MUOF): |
- Bleacher area improvements to paving and drainage
|
- Scope Pending City of Broomfield Approval
|
- Bleachers for the softball fields
|
- Scope Pending City of Broomfield Approval
|
- Connect stadium facilities to municipal sewer system
|
- Stadium facilities to be connected to municipal sewer system
|
- Resurface the running track
|
- Possible alternate available to add an eighth lane to the running track (funded by the City of Broomfield).
|
| |
|
| Information Technology (IT): |
Planned implementation (IT): |
- Upgrade WAN to provide capacity to support applications with high bandwidth demands
|
- Extend WAN to building, upgrade head end equipment.
|
- Upgrade LANs to provide reliable and responsive access to data, research, and information
|
- Upgrade existing LAN distribution.
|
- Implement VoIP to enhance communications capabilities and reduce cost.
|
- Install new VoIP telecommunications system.
|