Original construction date: 1959

Report Updated:  7/17/2008 
Project Details

Principal:  Ginger Ramsey

Project Manager (building):  Steve Schumacher
Project Manager (MUOF/athletic):  Joe Gierlach

Architect (building):  Anderson Mason Dale
Architect (MUOF/athletic):  Davis Partnership

Contractor (building):  Haselden Construction, LLC
Contractor (athletics): Golden Triangle Construction

Total Original Budget

$20,774,010

 

Building

  $20,502,747

Athletics - Revised

$639,463

 

 

Original athletics budget

 $271,263

 

 

Supplemental funding to athletics budget (City and County of Broomfield)

+ $386,200

Total Revised Budget

$21,160,210

View expenditures to date

Design Advisory Team:

Staff
John Long
Jeff Leonard
Terrence Dunn
Gina Malecha
Debby Tanigawa
Paulette Laging
Ginger Ramsey, Principal
Parents
Tom Deland
Kirk Oglesby
Bob Prince
Jeff Stamper
Wendy Fiedler

Student
Rachel Saccardi

Contact the DAT: DAT.Broomfield@BVSD.org 

DAT Meeting Schedule:

2007 
May 14, 17, 24
June 11, 25
July 23
Aug. 6, 20
Sept. 4
Nov. 19

Project Timeline

Scheduled Milestones (Building)
uSD (schematic design) due 06/07; Completed 06/07
uCM/GC selection 07/07; Completed 07/07
uDD (design development) drawings due 08/07; Competed 11/07
uCD (construction documents) due 11/07; adjusted due date 03/08; Completed 04/08
uConstruction scheduled 01/08 - 08/09; Currently under construction

Scheduled Milestones (Athletics )
Construction scheduled 04/08 - 08/08; Currently under construction

Project Status

Activity that has occurred this period (building):

Began construction.

Activity that has occurred this period (MUOF/Athletics):

Began construction.  

Activity planned for next period (building):

Air conditioning will be installed in counselors' offices, cafeteria and library; demolition of northwest wing; will pour foundation and set steel; construct new parking lot; install new boilers; prepare portables for occupancy

Activity planned for next period (MUOF/athletics):

Construction continues.

Critical issues (building):

None.

Critical issues (MUOF/athletics):

None.

 Budget status (building):

Budget overage will be covered by project contingency.

Budget status (MUOF/athletics):

On budget.

Schedule status:

Expected to complete on schedule.

Scope of Work
 Facility Condition Assessment (FCA):  Planned implementation (FCA):
  • HVAC upgrades including building wide air-conditioning
  • Provide air conditioning for areas of building currently not air conditioned excluding gymnasiums and locker rooms and similar spaces. 
  • Electrical distribution improvements
  • Electrical improvements as required for classrooms and for power to A/C equipment. 
  • Clock and intercom systems improvements
  • Replace clock and intercom systems.
  • Interior finishes upgraded (i.e. ceiling tiles, carpet and wall finishes, etc.)
  • Will upgrade finishes in limited areas, priority to be determined by DAT. 
  • Roof replacement and repairs 
  • Deleted from scope as that area of building will be demolished.
  • Restroom renovations including ADA accessibility where required
  • Will upgrade finishes and renovate for ADA accessibility in limited areas priority to be determined by DAT.
  • Site irrigation system improvements
  • Field irrigation repairs and replacement of controls.
  • Interior signage program
  • Consistent interior signage throughout. 
  • Site paving replacement and repair
  • Repave north staff parking lot. 
   
Program Compatibility Assessment (PCA):

Planned implementation (FCA):

  • Provide an applied technology lab facility
  • Remodel existing shop into technology lab.
  • Provide an additional science lab
  • Remodel math classrooms into science lab.
  • Renovate consumer studies
  • Construct new consumer studies area
  •  Counseling offices addition
  • Construct new counseling area.
  • Photo lab improvements
  • Remodel existing counseling area to new photo lab and classroom. 
  • Replace the original junior high wing with a two story structure
  • Demolish existing northwest classroom wing and construct new two story addition. 
  • Provide additional Special Education classrooms and offices
  • Construct new special education classrooms and teacher work space. 

 Multi-Use Outdoor Facilities (MUOF):

Planned implementation (MUOF):

  • Bleacher area improvements to paving and drainage
  • Scope Pending City of Broomfield Approval 
  • Bleachers for the softball fields
  • Scope Pending City of Broomfield Approval
  • Connect stadium facilities to municipal sewer system
  • Stadium facilities to be connected to municipal sewer system
  • Resurface the running track 
  • Possible alternate available to add an eighth lane to the running track (funded by the City of Broomfield).
   
Information Technology (IT): Planned implementation (IT):
  • Upgrade WAN to provide capacity to support applications with high bandwidth demands
  • Extend WAN to building, upgrade head end equipment.
  • Upgrade LANs to provide reliable and responsive access to data, research, and information
  • Upgrade existing LAN distribution.
  • Implement VoIP to enhance communications capabilities and reduce cost.
  • Install new VoIP telecommunications system.
   
   
   

 

 Project Photos

Groundbreaking May 19, 2008

 

 

 

 

 

 

Project model

 

 

 

 


 

Construction photos - July, 2008